Skip Navigation Links
FeedBack
Archive
About Us Expand     About Us
DownloadsExpand Downloads
Other RLDCsExpand Other RLDCs
R T I
Contact Us
Skip Navigation Links
Home
RealTime DataExpand RealTime Data
SchedulingExpand Scheduling
Open AccessExpand Open Access
CommercialExpand Commercial
ReportsExpand Reports
Useful Links
Vigilance Complaints
Disclaimer
State Power Position
Details Of Schedule Vs Actual For Generating Stations...
NER Grid Frequency
49.16 
Last Updated on:

08/09/08 at 21:53:30
Sr. No. Generating Station Schedule Actual Deviation
1 KATHALGURI, NEEPCO 200 206.8 6.8
2 AGARTALA, NEEPCO 78 62.6 -15.4
3 DOYANG, NEEPCO 67 66.3 -0.7
4 KHANDONG, NEEPCO 44 43.3 -0.7
5 KOPILI, NEEPCO 195 193.9 -1.1
6 KOPILI -II, NEEPCO 21 21.6 0.6
7 RANGANADI, NEEPCO 412 401.3 -10.7
8 LOKTAK, NHPC 89 93 4
9 CS TOTAL 1106 1088.8 -17.2
10 Assam    na 238.2 na
11 Meghalaya    na 105.2 na
12 Tripura    na 76.4 na
(Note: The figures shown above are indicative only and are calculated based on data acquired from remote locations in North Eastern Region over existing communication links.)
Reliability, Security and Economy in Power Transmission Best viewed with 1024 by 768 Screen Resolution : ©2000-2006 POWERGRID