Power System Operation Corporation Ltd
      (A wholly owned subsidiary of Power Grid Corporation of India Ltd)

NORTH EASTERN REGIONAL LOAD DESPATCH CENTRE

Skip Navigation Links
FeedBack
Archive
About Us Expand     About Us
Document Updation
DownloadsExpand Downloads
Other RLDCsExpand Other RLDCs
R T I
Disaster ManagementExpand Disaster Management
Contact Us
SEARCH
Skip Navigation Links
Home
SchedulingExpand Scheduling
Transfer CapabilityExpand Transfer Capability
Open AccessExpand Open Access
Market OperationExpand Market Operation
ReportsExpand Reports
CERC-KPI ReportsExpand CERC-KPI Reports
REC Mechanism
Useful Links
Vigilance Complaints
Disclaimer
INTRANET
STOA Software
Power Flow Tracer
हिन्दी वेबसाइट
   

 
Current Sch Rev No
17
  NOTE: MU REVISED BY DHEP

Changes made in Last Revision
  News Flash
1 Validation Committee Meeting for Q3 (Oct-Dec'16)on 30th August'16 at 1530 Hrs

Link 
NERLDC: Registered Users
New format for Affidavit for No Objection or Prior Standing Clearance for Bilateral and for Collective transactions
GYANODAY:Internship Gudilenes OF POSOCO
CERC approved procedure for drawal of start-up power
Procedure for Availing Start-up power for New Generating stations
Procedure for Integration of New Transmission Element into the Grid
NLDC Petition regarding inadequate FGMO response
Operating changes of Rs1000 per day or part as per provisions of amendment to CERC
IA on Petition 84/MP/2015_Implementation of FGMO in Indian Grid
Notification for POSOCO Power System Award -2016
NER Reactive Power Management Manual-2015
Black Start and Restoration Procedures of NER Grid 2015
MePDCL Regulation by NEEPCO
NER Telemetry Report_Aug2016
Validation Committee Meeting for Q3 (Oct-Dec'16)on 30th August'16 at 1530 Hrs
Detailed Procedure for Relieving Congestion in Real Time Operation 2013




 
At 1203 Hrs on 16.04.16 a grid disturbance of GD-V Category occurred in NER involving all states and all generators which were on bar except Islanded portion of Upper Assam with AGBPP NTPS & LTPS generation of 180 MW and corresponding load. The system was progressively restored at 1430 hrs of 16.04.16

 

एन.. आर. एल. डि. सि. उत्तर पूर्वी क्षेत्रीय विद्युत प्रणाली का सन्युक्त चालन सुनिश्चित करने हेतु शीर्ष संस्था है ।

NERLDC is the apex body to ensure integrated operation of the power system in the North Eastern Region.


Reliability, Security and Economy in Power Transmission Best viewed with 1024 by 768 Screen Resolution : ©2000-2006 POWERGRID