Power System Operation Corporation Limited
      (A Government of India Enterprise)

NORTH EASTERN REGIONAL LOAD DESPATCH CENTRE

Skip Navigation Links
FeedBack
Archive
About Us Expand     About Us
WEATHER
Document Updation
DownloadsExpand Downloads
Other RLDCsExpand Other RLDCs
R T I
Disaster ManagementExpand Disaster Management
Contact Us
SEARCH
Skip Navigation Links
Home
SchedulingExpand Scheduling
Transfer CapabilityExpand Transfer Capability
Open AccessExpand Open Access
Market OperationExpand Market Operation
Contracts & MaterialsExpand Contracts & Materials
ReportsExpand Reports
CERC-KPI ReportsExpand CERC-KPI Reports
REC Mechanism
New Element IntegrationExpand New Element Integration
Useful Links
Vigilance Complaints
Disclaimer
INTRANET
STOA Software
Reporting App
हिन्दी वेबसाइट
   
Demand Met
1512.40   
NER Grid Frequency
50.10
Current Sch Rev No
80
 

  News Flash
1 NERLDC website is available at http://www.nerldc.in/ and http://www.nerldc.org/
2 New STOA Software made live in NERLDC w.e.f 1st April 2019
3 ISGS under RSD - BgTPP Unit 1 (250 MW) w.e.f 18.30 Hrs of 04.05.2019 & RSD withdrawn at 23:02 hrs of 05.05.2019
4 Web based Energy Scheduling(WBES) system has been implemented from 1st September'2018 in NER

Link 
NERLDC: Registered Users
Final Scheme of Regulation of Power Supply to MePDCL by NEEPCO
Final Scheme of Regulation of Power Supply to MeECL by NTPC w.e.f. 00:00 hrs of 22.05.2019
Draft NOAR Procedure for Stakeholder Consultations
Procedure for Availing Start-up power for New Generating stations
Procedure for Integration of New Transmission Element into the Grid
NLDC Petition regarding inadequate FGMO response
Operating charges of Rs1000 per day or part as per provisions of amendment to CERC
Black Start and Restoration Procedures of NER Grid 2018
NER REACTIVE POWER MANAGEMENT MANUAL 2018
ANNEXURE OF NER REACTIVE POWER MANAGEMENT MANUAL 2018
NERLDC PLI Petition For FY 2017-18
PoC rates and transmission losses for the period April to June 2018
GYANODAY:Internship Gudilenes OF POSOCO
CERC approved procedure for drawal of start-up power




 
At 1150 Hrs on 20.04.19 a grid disturbance of GD-V Category occurred in which States of Mizoram Manipur South Assam part of Meghalaya Tripura including Bangladesh got separated from the rest of NER Grid and subsequently collapsed due to load generation mismatch. The system was progressively restored at 1530 hrs of 20.04.19.

 

एन.. आर. एल. डि. सि. उत्तर पूर्वी क्षेत्रीय विद्युत प्रणाली का सन्युक्त चालन सुनिश्चित करने हेतु शीर्ष संस्था है ।

NERLDC is the apex body to ensure integrated operation of the power system in the North Eastern Region.


Reliability, Security and Economy in Power Transmission Best viewed with 1024 by 768 Screen Resolution : ©2000-2006 POSOCO