Power System Operation Corporation Ltd
      (A wholly owned subsidiary of Power Grid Corporation of India Ltd)

NORTH EASTERN REGIONAL LOAD DESPATCH CENTRE

Skip Navigation Links
FeedBack
Archive
About Us Expand     About Us
Document UpdationExpand Document Updation
Disturbance ReportExpand Disturbance Report
DownloadsExpand Downloads
Other RLDCsExpand Other RLDCs
R T I
Disaster ManagementExpand Disaster Management
Contact Us
SEARCH
Skip Navigation Links
Home
RealTime DataExpand RealTime Data
SchedulingExpand Scheduling
Transfer CapabilityExpand Transfer Capability
Open AccessExpand Open Access
Market OperationExpand Market Operation
ReportsExpand Reports
CERC-KPI ReportsExpand CERC-KPI Reports
REC Mechanism
Useful Links
Vigilance Complaints
Disclaimer
INTRANET
STOA Software
Power Flow Tracer
Weather related ReportsExpand Weather related Reports
हिन्दी वेबसाइट
   
Deviation Charge (Paise/kWh)
00.00 
NER Grid Frequency
50.12
Current Sch Rev No
13
UPDATED AT  28/05/16 , 17:17:00 NOTE: PARTIAL REQUISITION WITHDRAWN BY TRIPURA FROM PALATANA (BLK:64-96).

Changes made in Last Revision
  News Flash
1 Central Electricity Regulatory Commission (IEGC) (2nd Amendment) Regulations 2014 with effect from 17.2.2014
2 (Draft- List of Important Grid Elements of NER-2016-17) is under the Document Updation Tab

Link 
NERLDC: Registered Users
New format for Affidavit for No Objection or Prior Standing Clearance for Bilateral and for Collective transactions
GYANODAY:Internship Gudilenes OF POSOCO
CERC approved procedure for drawal of start-up power
Procedure for Availing Start-up power for New Generating stations
Procedure for Integration of New Transmission Element into the Grid
NLDC Petition regarding inadequate FGMO response
Operating changes of Rs1000 per day or part as per provisions of amendment to CERC
IA on Petition 84/MP/2015_Implementation of FGMO in Indian Grid
Notification for POSOCO Power System Award -2016
NER Reactive Power Management Manual-2015
Black Start and Restoration Procedures of NER Grid 2015
NER_Telemetry_Status_CERC_webupdate-02.05.2016
PoC Rates and Losses order for Q4 of 2015-16
CERC Approval of Slab rates for PoC Rates and Losses for Q4
TSECL Regulation by NEEPCO
MePDCL Regulation by NEEPCO
All India Base Case for Q1- 2016-17- Comments by 5th April 2016




 
At 1203 Hrs on 16.04.16 a grid disturbance of GD-V Category occurred in NER involving all states and all generators which were on bar except Islanded portion of Upper Assam with AGBPP NTPS & LTPS generation of 180 MW and corresponding load. The system was progressively restored at 1430 hrs of 16.04.16

 

एन.. आर. एल. डि. सि. उत्तर पूर्वी क्षेत्रीय विद्युत प्रणाली का सन्युक्त चालन सुनिश्चित करने हेतु शीर्ष संस्था है ।

NERLDC is the apex body to ensure integrated operation of the power system in the North Eastern Region.


Reliability, Security and Economy in Power Transmission Best viewed with 1024 by 768 Screen Resolution : ©2000-2006 POWERGRID