Power System Operation Corporation Ltd
      (A wholly owned subsidiary of Power Grid Corporation of India Ltd)

NORTH EASTERN REGIONAL LOAD DESPATCH CENTRE

Skip Navigation Links
FeedBack
Archive
About Us Expand     About Us
Document UpdationExpand Document Updation
Disturbance ReportExpand Disturbance Report
DownloadsExpand Downloads
Other RLDCsExpand Other RLDCs
R T I
Disaster ManagementExpand Disaster Management
Contact Us
SEARCH
Skip Navigation Links
Home
RealTime DataExpand RealTime Data
SchedulingExpand Scheduling
Transfer CapabilityExpand Transfer Capability
Open AccessExpand Open Access
Market OperationExpand Market Operation
ReportsExpand Reports
REC Mechanism
Useful Links
Vigilance Complaints
Disclaimer
INTRANET
STOA Software
Power Flow Tracer
हिन्दी वेबसाइट
   
Deviation Charge (Paise/kWh)
35.60 
NER Grid Frequency
50.04
Current Sch Rev No
10
UPDATED AT  30/05/15 , 07:43:00 NOTE :DC REVISED BY ER ISGS

Changes made in Last Revision
  News Flash
1 Central Electricity Regulatory Commission (IEGC) (2nd Amendment) Regulations 2014 with effect from 17.2.2014

Link 
NERLDC: Registered Users
New format for Affidavit for No Objection or Prior Standing Clearance for Bilateral and for Collective transactions
Operating Procedure of NER -July 2014
GYANODAY:Internship Gudilenes OF POSOCO
CERC approved procedure for drawal of start-up power
CEO-POSOCO APPEAL
Procedure for Availing Start-up power for New Generating stations
Procedure for Integration of New Transmission Element into the Grid
Black Start and Restoration procedure of NER Grid 2014
REACTIVE POWER MANAGEMENT & VOLTAGE CONTROL 2014
Regulation of Power supply to MeECL wef 18-01-2015
Review Petition under Regulation 12 of the C E R C (DSM & related matters) Regulations 2014
NER_Telemetry_Status_CERC-02.02.2015
NLDC Petition regarding inadequate FGMO response
Operating changes of Rs1000 per day or part as per provisions of amendment to CERC




 
At 1809 Hrs on 23.02.15 a grid disturbance of GD-V Category occurred in NER involving all states and generators except Islanded portion of Upper Assam with AGBPP NTPS & LTPS generation of 308 MW and corresponding load. The system was progressively restored at 1946 hrs of 23.02.15

 

एन.. आर. एल. डि. सि. उत्तर पूर्वी क्षेत्रीय विद्युत प्रणाली का सन्युक्त चालन सुनिश्चित करने हेतु शीर्ष संस्था है ।

NERLDC is the apex body to ensure integrated operation of the power system in the North Eastern Region.


Reliability, Security and Economy in Power Transmission Best viewed with 1024 by 768 Screen Resolution : ©2000-2006 POWERGRID